{"id":31778,"date":"2026-03-17T14:06:43","date_gmt":"2026-03-17T13:06:43","guid":{"rendered":"https:\/\/www.comsa.com\/la-y-vasca-avanza-hacia-su-recta-final\/"},"modified":"2026-03-17T14:12:19","modified_gmt":"2026-03-17T13:12:19","slug":"la-y-vasca-avanza-hacia-su-recta-final","status":"publish","type":"post","link":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/","title":{"rendered":"The Basque Y-shaped line is entering its final stages"},"content":{"rendered":"<p>Work on the Bergara Interchange, where the three high-speed lines from Bilbao, San Sebasti\u00e1n and Vitoria converge, continues to progress towards its final phase.<\/p>\n<p>COMSA, alongside Nort\u00fanel, S.A., Campezo Obras y Servicios and CYCASA Canteras y Construcciones, S.A., is involved in the construction of sector 3 of the Bergara junction (Mondrag\u00f3n-Elorrio-Bergara), a project presenting significant technical and construction challenges in a highly complex environment.<\/p>\n<p>The project has included the construction of the Kortazar tunnel, a double-track tunnel 1,971 metres long, as well as a 900-metre emergency tunnel. Two viaducts have also been built: the 551-metre-long Kortazar viaduct (with 69-metre spans) and the 30-metre-long Emboquille de Kortazar viaduct.<\/p>\n<p>The project is completed by the construction of connections between the tunnel and the gallery, walls, drainage systems and other safety features, as well as environmental restoration measures aimed at promoting the integration of the infrastructure with the local fauna, flora and watercourses.<\/p>\n<p>Recently, the Minister for Transport and Mobility, \u00d3scar Puente, visited the site to assess the progress of works at this strategic hub of the high-speed network.<\/p>\n<p>This project contributes to the development of the Basque Y, a key infrastructure for improving rail connectivity in the Basque Country.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work on the Bergara Interchange, where the three high-speed lines from Bilbao, San Sebasti\u00e1n and Vitoria converge, continues to progress towards its final phase. COMSA, alongside Nort\u00fanel, S.A., Campezo Obras y Servicios and CYCASA Canteras y Construcciones, S.A., is involved in the construction of sector 3 of the Bergara junction (Mondrag\u00f3n-Elorrio-Bergara), a project presenting significant [&hellip;]<\/p>\n","protected":false},"author":21,"featured_media":31775,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1155],"tags":[],"class_list":["post-31778","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructures"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Basque Y-shaped line is entering its final stages<\/title>\n<meta name=\"description\" content=\"Work on the Bergara Interchange, where the three high-speed lines from Bilbao, San Sebasti\u00e1n and Vitoria converge, continues to progress towards its final\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Basque Y-shaped line is entering its final stages\" \/>\n<meta property=\"og:description\" content=\"Work on the Bergara Interchange, where the three high-speed lines from Bilbao, San Sebasti\u00e1n and Vitoria converge, continues to progress towards its final\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/\" \/>\n<meta property=\"og:site_name\" content=\"COMSA Corporaci\u00f3n de Infraestructuras, S.L.\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-17T13:06:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-17T13:12:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.comsa.com\/wp-content\/uploads\/Proyecto-nuevo-2026-03-17T125431.059.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"566\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"jordi.munoz@comsa.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:site\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"jordi.munoz@comsa.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/\"},\"author\":{\"name\":\"jordi.munoz@comsa.com\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/422e40e86c651b7b221f80313a00cccf\"},\"headline\":\"The Basque Y-shaped line is entering its final stages\",\"datePublished\":\"2026-03-17T13:06:43+00:00\",\"dateModified\":\"2026-03-17T13:12:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/\"},\"wordCount\":209,\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/Proyecto-nuevo-2026-03-17T125431.059.png\",\"articleSection\":[\"Infrastructures\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/\",\"name\":\"The Basque Y-shaped line is entering its final stages\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/Proyecto-nuevo-2026-03-17T125431.059.png\",\"datePublished\":\"2026-03-17T13:06:43+00:00\",\"dateModified\":\"2026-03-17T13:12:19+00:00\",\"description\":\"Work on the Bergara Interchange, where the three high-speed lines from Bilbao, San Sebasti\u00e1n and Vitoria converge, continues to progress towards its final\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/Proyecto-nuevo-2026-03-17T125431.059.png\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/Proyecto-nuevo-2026-03-17T125431.059.png\",\"width\":1080,\"height\":566},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/la-y-vasca-avanza-hacia-su-recta-final\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"COMSA Corporaci\u00f3n\",\"item\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Basque Y-shaped line is entering its final stages\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"name\":\"COMSA Corporaci\u00f3n\",\"description\":\"Construcci\u00f3n y mantenimiento de infraestructuras\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\",\"name\":\"COMSA CORPORACI\u00d3N\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"width\":1,\"height\":1,\"caption\":\"COMSA CORPORACI\u00d3N\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/comsa_corp\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/comsa-corporaci\u00f3n\\\/\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/COMSACorporacion\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/422e40e86c651b7b221f80313a00cccf\",\"name\":\"jordi.munoz@comsa.com\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Basque Y-shaped line is entering its final stages","description":"Work on the Bergara Interchange, where the three high-speed lines from Bilbao, San Sebasti\u00e1n and Vitoria converge, continues to progress towards its final","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/","og_locale":"en_US","og_type":"article","og_title":"The Basque Y-shaped line is entering its final stages","og_description":"Work on the Bergara Interchange, where the three high-speed lines from Bilbao, San Sebasti\u00e1n and Vitoria converge, continues to progress towards its final","og_url":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/","og_site_name":"COMSA Corporaci\u00f3n de Infraestructuras, S.L.","article_published_time":"2026-03-17T13:06:43+00:00","article_modified_time":"2026-03-17T13:12:19+00:00","og_image":[{"width":1080,"height":566,"url":"https:\/\/www.comsa.com\/wp-content\/uploads\/Proyecto-nuevo-2026-03-17T125431.059.png","type":"image\/png"}],"author":"jordi.munoz@comsa.com","twitter_card":"summary_large_image","twitter_creator":"@comsa_corp","twitter_site":"@comsa_corp","twitter_misc":{"Written by":"jordi.munoz@comsa.com","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/#article","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/"},"author":{"name":"jordi.munoz@comsa.com","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/422e40e86c651b7b221f80313a00cccf"},"headline":"The Basque Y-shaped line is entering its final stages","datePublished":"2026-03-17T13:06:43+00:00","dateModified":"2026-03-17T13:12:19+00:00","mainEntityOfPage":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/"},"wordCount":209,"publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/Proyecto-nuevo-2026-03-17T125431.059.png","articleSection":["Infrastructures"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/","url":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/","name":"The Basque Y-shaped line is entering its final stages","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/#primaryimage"},"image":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/Proyecto-nuevo-2026-03-17T125431.059.png","datePublished":"2026-03-17T13:06:43+00:00","dateModified":"2026-03-17T13:12:19+00:00","description":"Work on the Bergara Interchange, where the three high-speed lines from Bilbao, San Sebasti\u00e1n and Vitoria converge, continues to progress towards its final","breadcrumb":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/#primaryimage","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/Proyecto-nuevo-2026-03-17T125431.059.png","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/Proyecto-nuevo-2026-03-17T125431.059.png","width":1080,"height":566},{"@type":"BreadcrumbList","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/la-y-vasca-avanza-hacia-su-recta-final\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"COMSA Corporaci\u00f3n","item":"https:\/\/www.comsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"The Basque Y-shaped line is entering its final stages"}]},{"@type":"WebSite","@id":"https:\/\/www.comsa.com\/en\/#website","url":"https:\/\/www.comsa.com\/en\/","name":"COMSA Corporaci\u00f3n","description":"Construcci\u00f3n y mantenimiento de infraestructuras","publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.comsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.comsa.com\/en\/#organization","name":"COMSA CORPORACI\u00d3N","url":"https:\/\/www.comsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","width":1,"height":1,"caption":"COMSA CORPORACI\u00d3N"},"image":{"@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/comsa_corp","https:\/\/www.linkedin.com\/company\/comsa-corporaci\u00f3n\/","https:\/\/www.youtube.com\/c\/COMSACorporacion"]},{"@type":"Person","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/422e40e86c651b7b221f80313a00cccf","name":"jordi.munoz@comsa.com"}]}},"_links":{"self":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/31778","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/comments?post=31778"}],"version-history":[{"count":2,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/31778\/revisions"}],"predecessor-version":[{"id":31782,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/31778\/revisions\/31782"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media\/31775"}],"wp:attachment":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media?parent=31778"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/categories?post=31778"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/tags?post=31778"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}