{"id":30201,"date":"2025-05-16T10:25:44","date_gmt":"2025-05-16T08:25:44","guid":{"rendered":"https:\/\/www.comsa.com\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/"},"modified":"2025-05-16T10:27:22","modified_gmt":"2025-05-16T08:27:22","slug":"comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao","status":"publish","type":"post","link":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/","title":{"rendered":"COMSA Industrial has been awarded the electrification works of the Bilbao Port"},"content":{"rendered":"<p class=\"noSpacingAbove spacingBelow\" data-text-type=\"withSpacing\">COMSA Industrial, in a joint venture with Sampol and Montajes El\u00e9ctricos San Ignacio, has been awarded the second phase of the electrification project for the Port of Bilbao, an initiative promoted by the Port Authority of Bilbao and partially financed by the CEF European Funds.<\/p>\n<p>The project will allow the ships berthed at the port to be connected to its electrical network, using OPS technology, reducing emissions, fuel consumption, noise and vibrations, thus contributing to the energy transition and decarbonisation of maritime transport.<\/p>\n<p>The action includes the electrification of docks A1, A2, A6, AZ3, and Getxo 2 and 3, with repowering of the power lines to reach 30 MW. To this end, 3 distribution centres, 11 transformation centres, 11 OPS points and 20 outlets will be installed to provide service to the ships, regardless of their berthing point on the quay.<\/p>\n<p>Our participation in this project reaffirms our commitment to the development of sustainable infrastructures that respect the environment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>COMSA Industrial, in a joint venture with Sampol and Montajes El\u00e9ctricos San Ignacio, has been awarded the second phase of the electrification project for the Port of Bilbao, an initiative promoted by the Port Authority of Bilbao and partially financed by the CEF European Funds. The project will allow the ships berthed at the port [&hellip;]<\/p>\n","protected":false},"author":20,"featured_media":30198,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1156],"tags":[],"class_list":["post-30201","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-engineering"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>COMSA Industrial has been awarded the electrification works of the Bilbao Port<\/title>\n<meta name=\"description\" content=\"COMSA Industrial, in a joint venture with Sampol and Montajes El\u00e9ctricos San Ignacio, has been awarded the second phase of the electrification project for\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"COMSA Industrial has been awarded the electrification works of the Bilbao Port\" \/>\n<meta property=\"og:description\" content=\"COMSA Industrial, in a joint venture with Sampol and Montajes El\u00e9ctricos San Ignacio, has been awarded the second phase of the electrification project for\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/\" \/>\n<meta property=\"og:site_name\" content=\"COMSA Corporaci\u00f3n de Infraestructuras, S.L.\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-16T08:25:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-16T08:27:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.comsa.com\/wp-content\/uploads\/Puerto-Bilbao.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"566\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"laura.gordillo@comsa.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:site\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"laura.gordillo@comsa.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/\"},\"author\":{\"name\":\"laura.gordillo@comsa.com\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/33032ecfd151f5c1000538323094270d\"},\"headline\":\"COMSA Industrial has been awarded the electrification works of the Bilbao Port\",\"datePublished\":\"2025-05-16T08:25:44+00:00\",\"dateModified\":\"2025-05-16T08:27:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/\"},\"wordCount\":165,\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/Puerto-Bilbao.jpg\",\"articleSection\":[\"Industrial engineering\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/\",\"name\":\"COMSA Industrial has been awarded the electrification works of the Bilbao Port\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/Puerto-Bilbao.jpg\",\"datePublished\":\"2025-05-16T08:25:44+00:00\",\"dateModified\":\"2025-05-16T08:27:22+00:00\",\"description\":\"COMSA Industrial, in a joint venture with Sampol and Montajes El\u00e9ctricos San Ignacio, has been awarded the second phase of the electrification project for\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/Puerto-Bilbao.jpg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/Puerto-Bilbao.jpg\",\"width\":1080,\"height\":566},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"COMSA Corporaci\u00f3n\",\"item\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"COMSA Industrial has been awarded the electrification works of the Bilbao Port\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"name\":\"COMSA Corporaci\u00f3n\",\"description\":\"Construcci\u00f3n y mantenimiento de infraestructuras\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\",\"name\":\"COMSA CORPORACI\u00d3N\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"width\":1,\"height\":1,\"caption\":\"COMSA CORPORACI\u00d3N\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/comsa_corp\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/comsa-corporaci\u00f3n\\\/\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/COMSACorporacion\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/33032ecfd151f5c1000538323094270d\",\"name\":\"laura.gordillo@comsa.com\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"COMSA Industrial has been awarded the electrification works of the Bilbao Port","description":"COMSA Industrial, in a joint venture with Sampol and Montajes El\u00e9ctricos San Ignacio, has been awarded the second phase of the electrification project for","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/","og_locale":"en_US","og_type":"article","og_title":"COMSA Industrial has been awarded the electrification works of the Bilbao Port","og_description":"COMSA Industrial, in a joint venture with Sampol and Montajes El\u00e9ctricos San Ignacio, has been awarded the second phase of the electrification project for","og_url":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/","og_site_name":"COMSA Corporaci\u00f3n de Infraestructuras, S.L.","article_published_time":"2025-05-16T08:25:44+00:00","article_modified_time":"2025-05-16T08:27:22+00:00","og_image":[{"width":1080,"height":566,"url":"https:\/\/www.comsa.com\/wp-content\/uploads\/Puerto-Bilbao.jpg","type":"image\/jpeg"}],"author":"laura.gordillo@comsa.com","twitter_card":"summary_large_image","twitter_creator":"@comsa_corp","twitter_site":"@comsa_corp","twitter_misc":{"Written by":"laura.gordillo@comsa.com","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/#article","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/"},"author":{"name":"laura.gordillo@comsa.com","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/33032ecfd151f5c1000538323094270d"},"headline":"COMSA Industrial has been awarded the electrification works of the Bilbao Port","datePublished":"2025-05-16T08:25:44+00:00","dateModified":"2025-05-16T08:27:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/"},"wordCount":165,"publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/Puerto-Bilbao.jpg","articleSection":["Industrial engineering"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/","url":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/","name":"COMSA Industrial has been awarded the electrification works of the Bilbao Port","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/#primaryimage"},"image":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/Puerto-Bilbao.jpg","datePublished":"2025-05-16T08:25:44+00:00","dateModified":"2025-05-16T08:27:22+00:00","description":"COMSA Industrial, in a joint venture with Sampol and Montajes El\u00e9ctricos San Ignacio, has been awarded the second phase of the electrification project for","breadcrumb":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/#primaryimage","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/Puerto-Bilbao.jpg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/Puerto-Bilbao.jpg","width":1080,"height":566},{"@type":"BreadcrumbList","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-se-ha-adjudicado-las-obras-de-electrificacion-del-puerto-de-bilbao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"COMSA Corporaci\u00f3n","item":"https:\/\/www.comsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"COMSA Industrial has been awarded the electrification works of the Bilbao Port"}]},{"@type":"WebSite","@id":"https:\/\/www.comsa.com\/en\/#website","url":"https:\/\/www.comsa.com\/en\/","name":"COMSA Corporaci\u00f3n","description":"Construcci\u00f3n y mantenimiento de infraestructuras","publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.comsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.comsa.com\/en\/#organization","name":"COMSA CORPORACI\u00d3N","url":"https:\/\/www.comsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","width":1,"height":1,"caption":"COMSA CORPORACI\u00d3N"},"image":{"@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/comsa_corp","https:\/\/www.linkedin.com\/company\/comsa-corporaci\u00f3n\/","https:\/\/www.youtube.com\/c\/COMSACorporacion"]},{"@type":"Person","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/33032ecfd151f5c1000538323094270d","name":"laura.gordillo@comsa.com"}]}},"_links":{"self":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/30201","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/comments?post=30201"}],"version-history":[{"count":1,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/30201\/revisions"}],"predecessor-version":[{"id":30202,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/30201\/revisions\/30202"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media\/30198"}],"wp:attachment":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media?parent=30201"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/categories?post=30201"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/tags?post=30201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}