{"id":17900,"date":"2021-11-23T15:27:24","date_gmt":"2021-11-23T14:27:24","guid":{"rendered":"https:\/\/www.comsa.com\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/"},"modified":"2021-11-23T15:31:06","modified_gmt":"2021-11-23T14:31:06","slug":"comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia","status":"publish","type":"post","link":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/","title":{"rendered":"COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia"},"content":{"rendered":"<p>COMSA Industrial has concluded the <strong>installation of the electromechanical systems and ITS<\/strong> (Intelligent Traffic Systems) <strong>of the tunnels integrated in the Cruce de la Cordillera Central<\/strong>, the greatest road construction work of Colombia\u2019s history, which was inaugurated yesterday, 22 November. This project allows improving the mobility between the centre and the south west of the country, as well as boosting the economy and competitivity.<\/p>\n<p>The Cruce de la Cordillera Central project covers a 30 km track between Calarc\u00e1 (Quind\u00edo) and Cajamarca (Tolima). 60 works have been executed: 30 km of second road, 25 tunnels (with a total length of 22 km), 31 viaducts (with a total length of 5 km) and 3 road exchangers.<\/p>\n<p>COMSA Industrial has been responsible for the installation of the electromechanical systems and ITS of the tunnels, including the <strong>La L\u00ednea Tunnel<\/strong>, the longest of Latin America (8.6 km). Thus, it has participated in the design, supply, installation and commissioning of the project\u2019s electromechanical systems such as fire detection and extinction, ventilation, lighting, energy, as well as ITS, SOS posts, closed circuit TV, communications and radio communications, dynamic signalling and the Control Centre.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>COMSA Industrial has concluded the installation of the electromechanical systems and ITS (Intelligent Traffic Systems) of the tunnels integrated in the Cruce de la Cordillera Central, the greatest road construction work of Colombia\u2019s history, which was inaugurated yesterday, 22 November. This project allows improving the mobility between the centre and the south west of the [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":17902,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1156],"tags":[],"class_list":["post-17900","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-engineering"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia<\/title>\n<meta name=\"description\" content=\"COMSA Industrial has concluded the installation of the electromechanical systems and ITS (Intelligent Traffic Systems) of the tunnels integrated in the\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia\" \/>\n<meta property=\"og:description\" content=\"COMSA Industrial has concluded the installation of the electromechanical systems and ITS (Intelligent Traffic Systems) of the tunnels integrated in the\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/\" \/>\n<meta property=\"og:site_name\" content=\"COMSA Corporaci\u00f3n de Infraestructuras, S.L.\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-23T14:27:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-23T14:31:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.comsa.com\/wp-content\/uploads\/WhatsApp-Image-2020-09-07-at-12.20.20-4-2.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1049\" \/>\n\t<meta property=\"og:image:height\" content=\"652\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Administrador\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:site\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Administrador\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/\"},\"author\":{\"name\":\"Administrador\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/ae18a316f7f7cfd8903a1e92991942b1\"},\"headline\":\"COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia\",\"datePublished\":\"2021-11-23T14:27:24+00:00\",\"dateModified\":\"2021-11-23T14:31:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/\"},\"wordCount\":197,\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/WhatsApp-Image-2020-09-07-at-12.20.20-4-2.jpeg\",\"articleSection\":[\"Industrial engineering\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/\",\"name\":\"COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/WhatsApp-Image-2020-09-07-at-12.20.20-4-2.jpeg\",\"datePublished\":\"2021-11-23T14:27:24+00:00\",\"dateModified\":\"2021-11-23T14:31:06+00:00\",\"description\":\"COMSA Industrial has concluded the installation of the electromechanical systems and ITS (Intelligent Traffic Systems) of the tunnels integrated in the\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/WhatsApp-Image-2020-09-07-at-12.20.20-4-2.jpeg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/WhatsApp-Image-2020-09-07-at-12.20.20-4-2.jpeg\",\"width\":1049,\"height\":652},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"COMSA Corporaci\u00f3n\",\"item\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"name\":\"COMSA Corporaci\u00f3n\",\"description\":\"Construcci\u00f3n y mantenimiento de infraestructuras\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\",\"name\":\"COMSA CORPORACI\u00d3N\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"width\":1,\"height\":1,\"caption\":\"COMSA CORPORACI\u00d3N\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/comsa_corp\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/comsa-corporaci\u00f3n\\\/\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/COMSACorporacion\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/ae18a316f7f7cfd8903a1e92991942b1\",\"name\":\"Administrador\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia","description":"COMSA Industrial has concluded the installation of the electromechanical systems and ITS (Intelligent Traffic Systems) of the tunnels integrated in the","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/","og_locale":"en_US","og_type":"article","og_title":"COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia","og_description":"COMSA Industrial has concluded the installation of the electromechanical systems and ITS (Intelligent Traffic Systems) of the tunnels integrated in the","og_url":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/","og_site_name":"COMSA Corporaci\u00f3n de Infraestructuras, S.L.","article_published_time":"2021-11-23T14:27:24+00:00","article_modified_time":"2021-11-23T14:31:06+00:00","og_image":[{"width":1049,"height":652,"url":"https:\/\/www.comsa.com\/wp-content\/uploads\/WhatsApp-Image-2020-09-07-at-12.20.20-4-2.jpeg","type":"image\/jpeg"}],"author":"Administrador","twitter_card":"summary_large_image","twitter_creator":"@comsa_corp","twitter_site":"@comsa_corp","twitter_misc":{"Written by":"Administrador","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/#article","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/"},"author":{"name":"Administrador","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/ae18a316f7f7cfd8903a1e92991942b1"},"headline":"COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia","datePublished":"2021-11-23T14:27:24+00:00","dateModified":"2021-11-23T14:31:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/"},"wordCount":197,"publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/WhatsApp-Image-2020-09-07-at-12.20.20-4-2.jpeg","articleSection":["Industrial engineering"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/","url":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/","name":"COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/#primaryimage"},"image":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/WhatsApp-Image-2020-09-07-at-12.20.20-4-2.jpeg","datePublished":"2021-11-23T14:27:24+00:00","dateModified":"2021-11-23T14:31:06+00:00","description":"COMSA Industrial has concluded the installation of the electromechanical systems and ITS (Intelligent Traffic Systems) of the tunnels integrated in the","breadcrumb":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/#primaryimage","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/WhatsApp-Image-2020-09-07-at-12.20.20-4-2.jpeg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/WhatsApp-Image-2020-09-07-at-12.20.20-4-2.jpeg","width":1049,"height":652},{"@type":"BreadcrumbList","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/comsa-industrial-finaliza-los-trabajos-de-its-en-los-tuneles-del-cruce-de-la-cordillera-central-en-colombia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"COMSA Corporaci\u00f3n","item":"https:\/\/www.comsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"COMSA Industrial finishes the ITS works in the Cruce de la Cordillera Central tunnels, in Colombia"}]},{"@type":"WebSite","@id":"https:\/\/www.comsa.com\/en\/#website","url":"https:\/\/www.comsa.com\/en\/","name":"COMSA Corporaci\u00f3n","description":"Construcci\u00f3n y mantenimiento de infraestructuras","publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.comsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.comsa.com\/en\/#organization","name":"COMSA CORPORACI\u00d3N","url":"https:\/\/www.comsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","width":1,"height":1,"caption":"COMSA CORPORACI\u00d3N"},"image":{"@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/comsa_corp","https:\/\/www.linkedin.com\/company\/comsa-corporaci\u00f3n\/","https:\/\/www.youtube.com\/c\/COMSACorporacion"]},{"@type":"Person","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/ae18a316f7f7cfd8903a1e92991942b1","name":"Administrador"}]}},"_links":{"self":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/17900","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/comments?post=17900"}],"version-history":[{"count":2,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/17900\/revisions"}],"predecessor-version":[{"id":17904,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/17900\/revisions\/17904"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media\/17902"}],"wp:attachment":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media?parent=17900"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/categories?post=17900"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/tags?post=17900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}