{"id":17809,"date":"2021-10-25T13:09:03","date_gmt":"2021-10-25T11:09:03","guid":{"rendered":"https:\/\/www.comsa.com\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/"},"modified":"2021-10-25T13:11:38","modified_gmt":"2021-10-25T11:11:38","slug":"comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil","status":"publish","type":"post","link":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/","title":{"rendered":"COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil"},"content":{"rendered":"<p><strong>COMSA<\/strong>, in consortium with the Brazilian infrastructure firm <strong>Marquise<\/strong>, has been awarded the contract to <strong>complete the Bel\u00e9m integrated transport system<\/strong>, known as <strong>BRT Metropolitan<\/strong>. The project, valued at just over 100 million euros, will improve the mobility of the inhabitants of the state of Par\u00e1, in Brazil, while at the same time will boost sustainable transport in the region.<\/p>\n<p>The contract includes the construction of a 10.8 km long bus lane in the median of the BR-316 access road to the city of Bel\u00e9m. The works also include the construction of 39 bus stops with passenger access control, a 125-metre-long, 24.7-metre-wide viaduct with a mixed structure and 11 pedestrian walkways.<\/p>\n<p>It is also planned the completion of two interconnection terminals with other bus lines. The Marituba and Ananindeua stations will thus have 2 accesses each, via subways, from the BRT lane. Finally, the project includes the construction of the Operational Control Centre, incorporating the implementation and commissioning of the management system for the entire BRT network.<\/p>\n<p>The works are completed with the replacement of affected services and the renovation of the BR-316 including the addition of two cycle lanes, drainage, street lighting, signposting and landscaping.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>COMSA, in consortium with the Brazilian infrastructure firm Marquise, has been awarded the contract to complete the Bel\u00e9m integrated transport system, known as BRT Metropolitan. The project, valued at just over 100 million euros, will improve the mobility of the inhabitants of the state of Par\u00e1, in Brazil, while at the same time will boost [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":17806,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1155],"tags":[],"class_list":["post-17809","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructures"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil<\/title>\n<meta name=\"description\" content=\"COMSA, in consortium with the Brazilian infrastructure firm Marquise, has been awarded the contract to complete the Bel\u00e9m integrated transport system,\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil\" \/>\n<meta property=\"og:description\" content=\"COMSA, in consortium with the Brazilian infrastructure firm Marquise, has been awarded the contract to complete the Bel\u00e9m integrated transport system,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/\" \/>\n<meta property=\"og:site_name\" content=\"COMSA Corporaci\u00f3n de Infraestructuras, S.L.\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-25T11:09:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-10-25T11:11:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.comsa.com\/wp-content\/uploads\/COMSA_ViaductoAnanindeua.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1125\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Administrador\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:site\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Administrador\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/\"},\"author\":{\"name\":\"Administrador\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/ae18a316f7f7cfd8903a1e92991942b1\"},\"headline\":\"COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil\",\"datePublished\":\"2021-10-25T11:09:03+00:00\",\"dateModified\":\"2021-10-25T11:11:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/\"},\"wordCount\":210,\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/COMSA_ViaductoAnanindeua.jpg\",\"articleSection\":[\"Infrastructures\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/\",\"name\":\"COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/COMSA_ViaductoAnanindeua.jpg\",\"datePublished\":\"2021-10-25T11:09:03+00:00\",\"dateModified\":\"2021-10-25T11:11:38+00:00\",\"description\":\"COMSA, in consortium with the Brazilian infrastructure firm Marquise, has been awarded the contract to complete the Bel\u00e9m integrated transport system,\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/COMSA_ViaductoAnanindeua.jpg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/COMSA_ViaductoAnanindeua.jpg\",\"width\":2000,\"height\":1125,\"caption\":\"default\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"COMSA Corporaci\u00f3n\",\"item\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"name\":\"COMSA Corporaci\u00f3n\",\"description\":\"Construcci\u00f3n y mantenimiento de infraestructuras\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\",\"name\":\"COMSA CORPORACI\u00d3N\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"width\":1,\"height\":1,\"caption\":\"COMSA CORPORACI\u00d3N\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/comsa_corp\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/comsa-corporaci\u00f3n\\\/\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/COMSACorporacion\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/ae18a316f7f7cfd8903a1e92991942b1\",\"name\":\"Administrador\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil","description":"COMSA, in consortium with the Brazilian infrastructure firm Marquise, has been awarded the contract to complete the Bel\u00e9m integrated transport system,","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/","og_locale":"en_US","og_type":"article","og_title":"COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil","og_description":"COMSA, in consortium with the Brazilian infrastructure firm Marquise, has been awarded the contract to complete the Bel\u00e9m integrated transport system,","og_url":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/","og_site_name":"COMSA Corporaci\u00f3n de Infraestructuras, S.L.","article_published_time":"2021-10-25T11:09:03+00:00","article_modified_time":"2021-10-25T11:11:38+00:00","og_image":[{"width":2000,"height":1125,"url":"https:\/\/www.comsa.com\/wp-content\/uploads\/COMSA_ViaductoAnanindeua.jpg","type":"image\/jpeg"}],"author":"Administrador","twitter_card":"summary_large_image","twitter_creator":"@comsa_corp","twitter_site":"@comsa_corp","twitter_misc":{"Written by":"Administrador","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/#article","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/"},"author":{"name":"Administrador","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/ae18a316f7f7cfd8903a1e92991942b1"},"headline":"COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil","datePublished":"2021-10-25T11:09:03+00:00","dateModified":"2021-10-25T11:11:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/"},"wordCount":210,"publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/COMSA_ViaductoAnanindeua.jpg","articleSection":["Infrastructures"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/","url":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/","name":"COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/#primaryimage"},"image":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/COMSA_ViaductoAnanindeua.jpg","datePublished":"2021-10-25T11:09:03+00:00","dateModified":"2021-10-25T11:11:38+00:00","description":"COMSA, in consortium with the Brazilian infrastructure firm Marquise, has been awarded the contract to complete the Bel\u00e9m integrated transport system,","breadcrumb":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/#primaryimage","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/COMSA_ViaductoAnanindeua.jpg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/COMSA_ViaductoAnanindeua.jpg","width":2000,"height":1125,"caption":"default"},{"@type":"BreadcrumbList","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-se-adjudica-la-finalizacion-de-los-trabajos-del-sistema-integrado-de-transporte-de-belem-en-brasil\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"COMSA Corporaci\u00f3n","item":"https:\/\/www.comsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"COMSA is awarded the contract to complete work on the Bel\u00e9m integrated transport system in Brazil"}]},{"@type":"WebSite","@id":"https:\/\/www.comsa.com\/en\/#website","url":"https:\/\/www.comsa.com\/en\/","name":"COMSA Corporaci\u00f3n","description":"Construcci\u00f3n y mantenimiento de infraestructuras","publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.comsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.comsa.com\/en\/#organization","name":"COMSA CORPORACI\u00d3N","url":"https:\/\/www.comsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","width":1,"height":1,"caption":"COMSA CORPORACI\u00d3N"},"image":{"@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/comsa_corp","https:\/\/www.linkedin.com\/company\/comsa-corporaci\u00f3n\/","https:\/\/www.youtube.com\/c\/COMSACorporacion"]},{"@type":"Person","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/ae18a316f7f7cfd8903a1e92991942b1","name":"Administrador"}]}},"_links":{"self":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/17809","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/comments?post=17809"}],"version-history":[{"count":2,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/17809\/revisions"}],"predecessor-version":[{"id":17811,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/17809\/revisions\/17811"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media\/17806"}],"wp:attachment":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media?parent=17809"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/categories?post=17809"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/tags?post=17809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}