{"id":17023,"date":"2021-06-15T14:01:49","date_gmt":"2021-06-15T12:01:49","guid":{"rendered":"https:\/\/www.comsa.com\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/"},"modified":"2021-06-15T14:03:56","modified_gmt":"2021-06-15T12:03:56","slug":"puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2","status":"publish","type":"post","link":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/","title":{"rendered":"Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways"},"content":{"rendered":"<p><strong>COMSA Industrial<\/strong> continues to progress in the installation of <strong>ITS<\/strong> (Intelligent Traffic Systems) in the <strong>Sinifan\u00e1<\/strong> and <strong>Amag\u00e1<\/strong> tunnels on the<strong> Pac\u00edfico 1 Connection Highway<\/strong>, as well as in the <strong>Mulatos<\/strong> tunnels in the <strong>Pacific 2<\/strong>, both located in the southwest of Antioquia in Colombia.<\/p>\n<p>Last Thursday, June 9, 19 large bridges and one of the two roads of the Sinifan\u00e1 Tunnel were put into service, achieving a 70% progress in the works carried out by the Engineering subsidiary of COMSA Corporaci\u00f3n.<\/p>\n<p>In the case of Pac\u00edfico 2, which covers the Bolombolo &#8211; La Pintada section, 20 kilometers of the Functional Unit 2 (UF2), the Mulatos tunnels of UF3 and the bridges over the Cauca river of UF4 were inaugurated. The La Pintada Connection Concession, which executes this connection, completes a 99% progress of the works and only needs to complete works on the Mulatos Bolombolo Tunnel, which is currently 97% completed, so this 4G route will be delivered at the beginning of the second semester of this 2021.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>COMSA Industrial continues to progress in the installation of ITS (Intelligent Traffic Systems) in the Sinifan\u00e1 and Amag\u00e1 tunnels on the Pac\u00edfico 1 Connection Highway, as well as in the Mulatos tunnels in the Pacific 2, both located in the southwest of Antioquia in Colombia. Last Thursday, June 9, 19 large bridges and one of [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":17021,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1156],"tags":[],"class_list":["post-17023","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrial-engineering"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways<\/title>\n<meta name=\"description\" content=\"COMSA Industrial continues to progress in the installation of ITS (Intelligent Traffic Systems) in the Sinifan\u00e1 and Amag\u00e1 tunnels on the Pac\u00edfico 1\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways\" \/>\n<meta property=\"og:description\" content=\"COMSA Industrial continues to progress in the installation of ITS (Intelligent Traffic Systems) in the Sinifan\u00e1 and Amag\u00e1 tunnels on the Pac\u00edfico 1\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/\" \/>\n<meta property=\"og:site_name\" content=\"COMSA Corporaci\u00f3n de Infraestructuras, S.L.\" \/>\n<meta property=\"article:published_time\" content=\"2021-06-15T12:01:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-06-15T12:03:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.comsa.com\/wp-content\/uploads\/UF1Sinifana.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1251\" \/>\n\t<meta property=\"og:image:height\" content=\"879\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Administrador\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:site\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Administrador\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/\"},\"author\":{\"name\":\"Administrador\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/ae18a316f7f7cfd8903a1e92991942b1\"},\"headline\":\"Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways\",\"datePublished\":\"2021-06-15T12:01:49+00:00\",\"dateModified\":\"2021-06-15T12:03:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/\"},\"wordCount\":174,\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/UF1Sinifana.jpg\",\"articleSection\":[\"Industrial engineering\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/\",\"name\":\"Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/UF1Sinifana.jpg\",\"datePublished\":\"2021-06-15T12:01:49+00:00\",\"dateModified\":\"2021-06-15T12:03:56+00:00\",\"description\":\"COMSA Industrial continues to progress in the installation of ITS (Intelligent Traffic Systems) in the Sinifan\u00e1 and Amag\u00e1 tunnels on the Pac\u00edfico 1\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/UF1Sinifana.jpg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/UF1Sinifana.jpg\",\"width\":1251,\"height\":879,\"caption\":\"Inauguraci\u00f3n de la UF1 del T\u00fanel de Sinifan\u00e1 en Colombia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/industrial-engineering\\\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"COMSA Corporaci\u00f3n\",\"item\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"name\":\"COMSA Corporaci\u00f3n\",\"description\":\"Construcci\u00f3n y mantenimiento de infraestructuras\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\",\"name\":\"COMSA CORPORACI\u00d3N\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"width\":1,\"height\":1,\"caption\":\"COMSA CORPORACI\u00d3N\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/comsa_corp\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/comsa-corporaci\u00f3n\\\/\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/COMSACorporacion\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/ae18a316f7f7cfd8903a1e92991942b1\",\"name\":\"Administrador\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways","description":"COMSA Industrial continues to progress in the installation of ITS (Intelligent Traffic Systems) in the Sinifan\u00e1 and Amag\u00e1 tunnels on the Pac\u00edfico 1","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/","og_locale":"en_US","og_type":"article","og_title":"Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways","og_description":"COMSA Industrial continues to progress in the installation of ITS (Intelligent Traffic Systems) in the Sinifan\u00e1 and Amag\u00e1 tunnels on the Pac\u00edfico 1","og_url":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/","og_site_name":"COMSA Corporaci\u00f3n de Infraestructuras, S.L.","article_published_time":"2021-06-15T12:01:49+00:00","article_modified_time":"2021-06-15T12:03:56+00:00","og_image":[{"width":1251,"height":879,"url":"https:\/\/www.comsa.com\/wp-content\/uploads\/UF1Sinifana.jpg","type":"image\/jpeg"}],"author":"Administrador","twitter_card":"summary_large_image","twitter_creator":"@comsa_corp","twitter_site":"@comsa_corp","twitter_misc":{"Written by":"Administrador","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/#article","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/"},"author":{"name":"Administrador","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/ae18a316f7f7cfd8903a1e92991942b1"},"headline":"Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways","datePublished":"2021-06-15T12:01:49+00:00","dateModified":"2021-06-15T12:03:56+00:00","mainEntityOfPage":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/"},"wordCount":174,"publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/UF1Sinifana.jpg","articleSection":["Industrial engineering"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/","url":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/","name":"Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/#primaryimage"},"image":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/UF1Sinifana.jpg","datePublished":"2021-06-15T12:01:49+00:00","dateModified":"2021-06-15T12:03:56+00:00","description":"COMSA Industrial continues to progress in the installation of ITS (Intelligent Traffic Systems) in the Sinifan\u00e1 and Amag\u00e1 tunnels on the Pac\u00edfico 1","breadcrumb":{"@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/#primaryimage","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/UF1Sinifana.jpg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/UF1Sinifana.jpg","width":1251,"height":879,"caption":"Inauguraci\u00f3n de la UF1 del T\u00fanel de Sinifan\u00e1 en Colombia"},{"@type":"BreadcrumbList","@id":"https:\/\/www.comsa.com\/en\/industrial-engineering\/puesta-en-marcha-de-las-vias-4g-de-las-autopistas-de-conexion-pacifico-1-y-pacifico-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"COMSA Corporaci\u00f3n","item":"https:\/\/www.comsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"Commissioning of 4G lanes of the Pac\u00edfico 1 and Pac\u00edfico 2 connection highways"}]},{"@type":"WebSite","@id":"https:\/\/www.comsa.com\/en\/#website","url":"https:\/\/www.comsa.com\/en\/","name":"COMSA Corporaci\u00f3n","description":"Construcci\u00f3n y mantenimiento de infraestructuras","publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.comsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.comsa.com\/en\/#organization","name":"COMSA CORPORACI\u00d3N","url":"https:\/\/www.comsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","width":1,"height":1,"caption":"COMSA CORPORACI\u00d3N"},"image":{"@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/comsa_corp","https:\/\/www.linkedin.com\/company\/comsa-corporaci\u00f3n\/","https:\/\/www.youtube.com\/c\/COMSACorporacion"]},{"@type":"Person","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/ae18a316f7f7cfd8903a1e92991942b1","name":"Administrador"}]}},"_links":{"self":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/17023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/comments?post=17023"}],"version-history":[{"count":3,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/17023\/revisions"}],"predecessor-version":[{"id":17026,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/17023\/revisions\/17026"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media\/17021"}],"wp:attachment":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media?parent=17023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/categories?post=17023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/tags?post=17023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}