{"id":16934,"date":"2021-06-08T10:18:02","date_gmt":"2021-06-08T08:18:02","guid":{"rendered":"https:\/\/www.comsa.com\/?p=16934"},"modified":"2021-06-08T10:25:55","modified_gmt":"2021-06-08T08:25:55","slug":"comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia","status":"publish","type":"post","link":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/","title":{"rendered":"COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia"},"content":{"rendered":"<p>The joint venture formed by <strong>COMSA and Lantania<\/strong> has been awarded the <strong>renovation works for the Line 1 of Metrovalencia commissioned by Ferrocarrils de la Generalitat Valenciana<\/strong> (FGV).<\/p>\n<p>The works will be developed in the section between the Valencia Sud and Villanueva de Castell\u00f3n stations and will consist of the <strong>replacement of the existing turnouts with their drives and the modification of interlocks and centralized traffic control systems (CTC)<\/strong> due to changes in track configurations at some stations.<\/p>\n<p>The contract also includes the <strong>renewal of the track in several branches<\/strong>, the most notable being the section between Paiporta-Torrent (3,600 m) and Espioca-Almaguer (1,880 m). Furthermore, the reform of the level crossings will be carried out, both for vehicles and pedestrians, which will involve the renovation of the road in the affected section, and the placement of a crossing over the Strail-type rubber tracks.<\/p>\n<p>The main work units to be executed are the <strong>replacement of 45 turnouts, the supply and placement of 14,374 monobloc prestressed concrete sleepers, and the supply and placement of 24,932 m<sup>3<\/sup> of ballast<\/strong>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The joint venture formed by COMSA and Lantania has been awarded the renovation works for the Line 1 of Metrovalencia commissioned by Ferrocarrils de la Generalitat Valenciana (FGV). The works will be developed in the section between the Valencia Sud and Villanueva de Castell\u00f3n stations and will consist of the replacement of the existing turnouts [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":16932,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1155],"tags":[],"class_list":["post-16934","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructures"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia<\/title>\n<meta name=\"description\" content=\"The joint venture formed by COMSA and Lantania has been awarded the renovation works for the Line 1 of Metrovalencia commissioned by Ferrocarrils de la\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia\" \/>\n<meta property=\"og:description\" content=\"The joint venture formed by COMSA and Lantania has been awarded the renovation works for the Line 1 of Metrovalencia commissioned by Ferrocarrils de la\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/\" \/>\n<meta property=\"og:site_name\" content=\"COMSA Corporaci\u00f3n de Infraestructuras, S.L.\" \/>\n<meta property=\"article:published_time\" content=\"2021-06-08T08:18:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-06-08T08:25:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.comsa.com\/wp-content\/uploads\/L1_Metrovalencia.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Administrador\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:site\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Administrador\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/\"},\"author\":{\"name\":\"Administrador\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/ae18a316f7f7cfd8903a1e92991942b1\"},\"headline\":\"COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia\",\"datePublished\":\"2021-06-08T08:18:02+00:00\",\"dateModified\":\"2021-06-08T08:25:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/\"},\"wordCount\":184,\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/L1_Metrovalencia.jpg\",\"articleSection\":[\"Infrastructures\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/\",\"name\":\"COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/L1_Metrovalencia.jpg\",\"datePublished\":\"2021-06-08T08:18:02+00:00\",\"dateModified\":\"2021-06-08T08:25:55+00:00\",\"description\":\"The joint venture formed by COMSA and Lantania has been awarded the renovation works for the Line 1 of Metrovalencia commissioned by Ferrocarrils de la\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/L1_Metrovalencia.jpg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/L1_Metrovalencia.jpg\",\"width\":1200,\"height\":900,\"caption\":\"L1 Metrovalencia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"COMSA Corporaci\u00f3n\",\"item\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"name\":\"COMSA Corporaci\u00f3n\",\"description\":\"Construcci\u00f3n y mantenimiento de infraestructuras\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\",\"name\":\"COMSA CORPORACI\u00d3N\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"width\":1,\"height\":1,\"caption\":\"COMSA CORPORACI\u00d3N\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/comsa_corp\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/comsa-corporaci\u00f3n\\\/\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/COMSACorporacion\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/ae18a316f7f7cfd8903a1e92991942b1\",\"name\":\"Administrador\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia","description":"The joint venture formed by COMSA and Lantania has been awarded the renovation works for the Line 1 of Metrovalencia commissioned by Ferrocarrils de la","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/","og_locale":"en_US","og_type":"article","og_title":"COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia","og_description":"The joint venture formed by COMSA and Lantania has been awarded the renovation works for the Line 1 of Metrovalencia commissioned by Ferrocarrils de la","og_url":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/","og_site_name":"COMSA Corporaci\u00f3n de Infraestructuras, S.L.","article_published_time":"2021-06-08T08:18:02+00:00","article_modified_time":"2021-06-08T08:25:55+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/www.comsa.com\/wp-content\/uploads\/L1_Metrovalencia.jpg","type":"image\/jpeg"}],"author":"Administrador","twitter_card":"summary_large_image","twitter_creator":"@comsa_corp","twitter_site":"@comsa_corp","twitter_misc":{"Written by":"Administrador","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/#article","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/"},"author":{"name":"Administrador","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/ae18a316f7f7cfd8903a1e92991942b1"},"headline":"COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia","datePublished":"2021-06-08T08:18:02+00:00","dateModified":"2021-06-08T08:25:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/"},"wordCount":184,"publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/L1_Metrovalencia.jpg","articleSection":["Infrastructures"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/","url":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/","name":"COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/#primaryimage"},"image":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/L1_Metrovalencia.jpg","datePublished":"2021-06-08T08:18:02+00:00","dateModified":"2021-06-08T08:25:55+00:00","description":"The joint venture formed by COMSA and Lantania has been awarded the renovation works for the Line 1 of Metrovalencia commissioned by Ferrocarrils de la","breadcrumb":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/#primaryimage","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/L1_Metrovalencia.jpg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/L1_Metrovalencia.jpg","width":1200,"height":900,"caption":"L1 Metrovalencia"},{"@type":"BreadcrumbList","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-corporacion-se-adjudica-las-obras-de-renovacion-de-la-linea-1-de-metrovalencia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"COMSA Corporaci\u00f3n","item":"https:\/\/www.comsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"COMSA Corporaci\u00f3n is awarded the renovation works for the Line 1 of Metrovalencia"}]},{"@type":"WebSite","@id":"https:\/\/www.comsa.com\/en\/#website","url":"https:\/\/www.comsa.com\/en\/","name":"COMSA Corporaci\u00f3n","description":"Construcci\u00f3n y mantenimiento de infraestructuras","publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.comsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.comsa.com\/en\/#organization","name":"COMSA CORPORACI\u00d3N","url":"https:\/\/www.comsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","width":1,"height":1,"caption":"COMSA CORPORACI\u00d3N"},"image":{"@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/comsa_corp","https:\/\/www.linkedin.com\/company\/comsa-corporaci\u00f3n\/","https:\/\/www.youtube.com\/c\/COMSACorporacion"]},{"@type":"Person","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/ae18a316f7f7cfd8903a1e92991942b1","name":"Administrador"}]}},"_links":{"self":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/16934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/comments?post=16934"}],"version-history":[{"count":3,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/16934\/revisions"}],"predecessor-version":[{"id":16937,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/16934\/revisions\/16937"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media\/16932"}],"wp:attachment":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media?parent=16934"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/categories?post=16934"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/tags?post=16934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}