{"id":11669,"date":"2015-04-30T10:26:49","date_gmt":"2015-04-30T09:26:49","guid":{"rendered":"https:\/\/www.comsa.com\/?p=11669"},"modified":"2021-02-05T16:41:12","modified_gmt":"2021-02-05T15:41:12","slug":"comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante","status":"publish","type":"post","link":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/","title":{"rendered":"COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante"},"content":{"rendered":"\n<p>COMSA has won a contract for the replacement of rail track and upgrading of the infrastructure of a stretch of 11.3 kilometres of line 9 of the Alicante Metropolitan TRAM, belonging to the network of Ferrocarrils de la Generalitat Valenciana (Valencian Government Railways).<\/p>\n\n\n\n<p>With a value of 7.6 million euros and an execution period of eleven and a half months, the works include the comprehensive modernisation of the rail track superstructure between the stations of Olla de Altea and Calp, rehabilitation of the buildings of both stations, civil works for supporting the signalling and communications equipment, as well as other activities, such as replacing panels, increasing clearance in tunnels, improving drainage etc. In parallel, the work of remodelling and reinforcement of the structures of the railway workshop in D\u00e9nia will also be carried out.<\/p>\n\n\n\n<p>The joint venture, in which COMSA assumes the role of principal construction company and rail specialist, involved competing against thirteen consortia who had also tendered for this contract.<\/p>\n\n\n\n<p>The <a href=\"http:\/\/www.tramalicante.es\/page.php\" target=\"_blank\" rel=\"noopener\">TRAM Alicante<\/a>\u00a0connects the metropolitan area of Alicante, as well as various municipalities in the districts of Marina Baja and Marina Alta. Managed by <a title=\"FGV\" href=\"http:\/\/www.fgv.es\/\" target=\"_blank\" rel=\"noopener\">Ferrocarrils de la Generalitat Valenciana<\/a>, it is a hybrid transport system that combines the tram, running on both tram tracks and railway tracks, light rail and commuter services.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><a title=\"COMSA se adjudica la renovaci\u00f3n de m\u00e1s de 11 kil\u00f3metros de la l\u00ednea 9 de FGV en Alicante by COMSA EMTE, on Flickr\" href=\"https:\/\/www.flickr.com\/photos\/69167211@N03\/17293924806\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/farm8.staticflickr.com\/7672\/17293924806_77fb0e4d34.jpg\" alt=\"COMSA se adjudica la renovaci\u00f3n de m\u00e1s de 11 kil\u00f3metros de la l\u00ednea 9 de FGV en Alicante\" width=\"500\" height=\"334\" \/><\/a>A tie tamper of COMSA carrying out railway works<\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>COMSA has won a contract for the replacement of rail track and upgrading of the infrastructure of a stretch of 11.3 kilometres of line 9 of the Alicante Metropolitan TRAM, belonging to the network of Ferrocarrils de la Generalitat Valenciana (Valencian Government Railways). With a value of 7.6 million euros and an execution period of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1155],"tags":[],"class_list":["post-11669","post","type-post","status-publish","format-standard","hentry","category-infrastructures"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante<\/title>\n<meta name=\"description\" content=\"COMSA has won a contract for the replacement of rail track and upgrading of the infrastructure of a stretch of 11.3 kilometres of line 9 of the Alicante\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante\" \/>\n<meta property=\"og:description\" content=\"COMSA has won a contract for the replacement of rail track and upgrading of the infrastructure of a stretch of 11.3 kilometres of line 9 of the Alicante\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/\" \/>\n<meta property=\"og:site_name\" content=\"COMSA Corporaci\u00f3n de Infraestructuras, S.L.\" \/>\n<meta property=\"article:published_time\" content=\"2015-04-30T09:26:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-02-05T15:41:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/farm8.staticflickr.com\/7672\/17293924806_77fb0e4d34.jpg\" \/>\n<meta name=\"author\" content=\"SuperAdmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:site\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SuperAdmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/\"},\"author\":{\"name\":\"SuperAdmin\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/fd4343bfb6cfcc977b4a292d7d67520c\"},\"headline\":\"COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante\",\"datePublished\":\"2015-04-30T09:26:49+00:00\",\"dateModified\":\"2021-02-05T15:41:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/\"},\"wordCount\":240,\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/farm8.staticflickr.com\\\/7672\\\/17293924806_77fb0e4d34.jpg\",\"articleSection\":[\"Infrastructures\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/\",\"name\":\"COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/farm8.staticflickr.com\\\/7672\\\/17293924806_77fb0e4d34.jpg\",\"datePublished\":\"2015-04-30T09:26:49+00:00\",\"dateModified\":\"2021-02-05T15:41:12+00:00\",\"description\":\"COMSA has won a contract for the replacement of rail track and upgrading of the infrastructure of a stretch of 11.3 kilometres of line 9 of the Alicante\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/#primaryimage\",\"url\":\"https:\\\/\\\/farm8.staticflickr.com\\\/7672\\\/17293924806_77fb0e4d34.jpg\",\"contentUrl\":\"https:\\\/\\\/farm8.staticflickr.com\\\/7672\\\/17293924806_77fb0e4d34.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"COMSA Corporaci\u00f3n\",\"item\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"name\":\"COMSA Corporaci\u00f3n\",\"description\":\"Construcci\u00f3n y mantenimiento de infraestructuras\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\",\"name\":\"COMSA CORPORACI\u00d3N\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"width\":1,\"height\":1,\"caption\":\"COMSA CORPORACI\u00d3N\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/comsa_corp\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/comsa-corporaci\u00f3n\\\/\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/COMSACorporacion\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/fd4343bfb6cfcc977b4a292d7d67520c\",\"name\":\"SuperAdmin\",\"sameAs\":[\"https:\\\/\\\/comsa.vunkers.dev\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante","description":"COMSA has won a contract for the replacement of rail track and upgrading of the infrastructure of a stretch of 11.3 kilometres of line 9 of the Alicante","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/","og_locale":"en_US","og_type":"article","og_title":"COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante","og_description":"COMSA has won a contract for the replacement of rail track and upgrading of the infrastructure of a stretch of 11.3 kilometres of line 9 of the Alicante","og_url":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/","og_site_name":"COMSA Corporaci\u00f3n de Infraestructuras, S.L.","article_published_time":"2015-04-30T09:26:49+00:00","article_modified_time":"2021-02-05T15:41:12+00:00","og_image":[{"url":"https:\/\/farm8.staticflickr.com\/7672\/17293924806_77fb0e4d34.jpg","type":"","width":"","height":""}],"author":"SuperAdmin","twitter_card":"summary_large_image","twitter_creator":"@comsa_corp","twitter_site":"@comsa_corp","twitter_misc":{"Written by":"SuperAdmin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/#article","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/"},"author":{"name":"SuperAdmin","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/fd4343bfb6cfcc977b4a292d7d67520c"},"headline":"COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante","datePublished":"2015-04-30T09:26:49+00:00","dateModified":"2021-02-05T15:41:12+00:00","mainEntityOfPage":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/"},"wordCount":240,"publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/#primaryimage"},"thumbnailUrl":"https:\/\/farm8.staticflickr.com\/7672\/17293924806_77fb0e4d34.jpg","articleSection":["Infrastructures"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/","url":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/","name":"COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/#primaryimage"},"image":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/#primaryimage"},"thumbnailUrl":"https:\/\/farm8.staticflickr.com\/7672\/17293924806_77fb0e4d34.jpg","datePublished":"2015-04-30T09:26:49+00:00","dateModified":"2021-02-05T15:41:12+00:00","description":"COMSA has won a contract for the replacement of rail track and upgrading of the infrastructure of a stretch of 11.3 kilometres of line 9 of the Alicante","breadcrumb":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/#primaryimage","url":"https:\/\/farm8.staticflickr.com\/7672\/17293924806_77fb0e4d34.jpg","contentUrl":"https:\/\/farm8.staticflickr.com\/7672\/17293924806_77fb0e4d34.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/comsa-wins-the-contract-for-the-renovation-of-more-than-11-kilometres-of-rail-track-for-the-tram-alicante\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"COMSA Corporaci\u00f3n","item":"https:\/\/www.comsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"COMSA wins the contract for the renovation of more than 11 kilometres of rail track for the TRAM Alicante"}]},{"@type":"WebSite","@id":"https:\/\/www.comsa.com\/en\/#website","url":"https:\/\/www.comsa.com\/en\/","name":"COMSA Corporaci\u00f3n","description":"Construcci\u00f3n y mantenimiento de infraestructuras","publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.comsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.comsa.com\/en\/#organization","name":"COMSA CORPORACI\u00d3N","url":"https:\/\/www.comsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","width":1,"height":1,"caption":"COMSA CORPORACI\u00d3N"},"image":{"@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/comsa_corp","https:\/\/www.linkedin.com\/company\/comsa-corporaci\u00f3n\/","https:\/\/www.youtube.com\/c\/COMSACorporacion"]},{"@type":"Person","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/fd4343bfb6cfcc977b4a292d7d67520c","name":"SuperAdmin","sameAs":["https:\/\/comsa.vunkers.dev"]}]}},"_links":{"self":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/11669","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/comments?post=11669"}],"version-history":[{"count":1,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/11669\/revisions"}],"predecessor-version":[{"id":12020,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/11669\/revisions\/12020"}],"wp:attachment":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media?parent=11669"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/categories?post=11669"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/tags?post=11669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}