{"id":11640,"date":"2014-07-01T10:49:27","date_gmt":"2014-07-01T09:49:27","guid":{"rendered":"https:\/\/www.comsa.com\/?p=11640"},"modified":"2021-02-05T16:41:18","modified_gmt":"2021-02-05T15:41:18","slug":"travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line","status":"publish","type":"post","link":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/","title":{"rendered":"Travipos is to supply 90,000 sleepers for the Extremadura high speed line"},"content":{"rendered":"\n<p>The Ministry of Development, through <a href=\"http:\/\/www.adifaltavelocidad.es\" rel=\"no follow noopener\" target=\"_blank\">Adif Alta Velocidad<\/a>, has awarded Travipos the supply and transportation of 90,000 multipurpose sleepers for the M\u00e9rida-Badajoz section of the Madrid-Extremadura high speed line, 53.6 kilometres long. The project, worth 8.7 million Euros, has an execution period of eight months and will be carried out jointly with the company Andaluza de Traviesas.<\/p>\n\n\n\n<p>The contract includes the manufacturing of the sleepers, acquisition and installation of the fastenings, collection from the factory and transportation, unloading and custody during the works, amongst other elements. The multipurpose sleepers supplied are prepared for the circulation of trains on standard (1,688 millimetres) and international (1,435 millimetres) gauge tracks. The section may adopt either gauge through a simple change made to the rail fastening elements, maintaining the existing axis and gauge of the track.<\/p>\n\n\n\n<p><a href=\"http:\/\/www.travipos.com\" rel=\"no follow noopener\" target=\"_blank\">Travipos<\/a> is integrated into COMSA EMTE&#8217;s Infrastructures line of business. Located in Constant\u00ed (Tarragona), it specialises in the production of prestressed concrete sleepers for the railway sector, <a href=\"prensa.comsa.com?p=1298&amp;lang=en\" rel=\"no follow noopener\" target=\"_blank\">being one of the main suppliers for high speed lines in Spain<\/a>.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><a title=\"Travipos suministrar\u00e1 90.000 traviesas para la alta velocidad de Extremadura por COMSA EMTE, en Flickr\" href=\"https:\/\/www.flickr.com\/photos\/69167211@N03\/14362823839\/\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/farm4.staticflickr.com\/3919\/14362823839_683f08b73e.jpg\" alt=\"Travipos suministrar\u00e1 90.000 traviesas para la alta velocidad de Extremadura\" width=\"500\" height=\"375\" \/><\/a><\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Development, through Adif Alta Velocidad, has awarded Travipos the supply and transportation of 90,000 multipurpose sleepers for the M\u00e9rida-Badajoz section of the Madrid-Extremadura high speed line, 53.6 kilometres long. The project, worth 8.7 million Euros, has an execution period of eight months and will be carried out jointly with the company Andaluza [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1155],"tags":[],"class_list":["post-11640","post","type-post","status-publish","format-standard","hentry","category-infrastructures"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Travipos is to supply 90,000 sleepers for the Extremadura high speed line<\/title>\n<meta name=\"description\" content=\"The Ministry of Development, through Adif Alta Velocidad, has awarded Travipos the supply and transportation of 90,000 multipurpose sleepers for the\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Travipos is to supply 90,000 sleepers for the Extremadura high speed line\" \/>\n<meta property=\"og:description\" content=\"The Ministry of Development, through Adif Alta Velocidad, has awarded Travipos the supply and transportation of 90,000 multipurpose sleepers for the\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/\" \/>\n<meta property=\"og:site_name\" content=\"COMSA Corporaci\u00f3n de Infraestructuras, S.L.\" \/>\n<meta property=\"article:published_time\" content=\"2014-07-01T09:49:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-02-05T15:41:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/farm4.staticflickr.com\/3919\/14362823839_683f08b73e.jpg\" \/>\n<meta name=\"author\" content=\"SuperAdmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:site\" content=\"@comsa_corp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SuperAdmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/\"},\"author\":{\"name\":\"SuperAdmin\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/fd4343bfb6cfcc977b4a292d7d67520c\"},\"headline\":\"Travipos is to supply 90,000 sleepers for the Extremadura high speed line\",\"datePublished\":\"2014-07-01T09:49:27+00:00\",\"dateModified\":\"2021-02-05T15:41:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/\"},\"wordCount\":178,\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/farm4.staticflickr.com\\\/3919\\\/14362823839_683f08b73e.jpg\",\"articleSection\":[\"Infrastructures\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/\",\"name\":\"Travipos is to supply 90,000 sleepers for the Extremadura high speed line\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/farm4.staticflickr.com\\\/3919\\\/14362823839_683f08b73e.jpg\",\"datePublished\":\"2014-07-01T09:49:27+00:00\",\"dateModified\":\"2021-02-05T15:41:18+00:00\",\"description\":\"The Ministry of Development, through Adif Alta Velocidad, has awarded Travipos the supply and transportation of 90,000 multipurpose sleepers for the\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/#primaryimage\",\"url\":\"https:\\\/\\\/farm4.staticflickr.com\\\/3919\\\/14362823839_683f08b73e.jpg\",\"contentUrl\":\"https:\\\/\\\/farm4.staticflickr.com\\\/3919\\\/14362823839_683f08b73e.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/infrastructures\\\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"COMSA Corporaci\u00f3n\",\"item\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Travipos is to supply 90,000 sleepers for the Extremadura high speed line\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"name\":\"COMSA Corporaci\u00f3n\",\"description\":\"Construcci\u00f3n y mantenimiento de infraestructuras\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#organization\",\"name\":\"COMSA CORPORACI\u00d3N\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.comsa.com\\\/wp-content\\\/uploads\\\/comsa-logo.svg\",\"width\":1,\"height\":1,\"caption\":\"COMSA CORPORACI\u00d3N\"},\"image\":{\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/comsa_corp\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/comsa-corporaci\u00f3n\\\/\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/COMSACorporacion\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.comsa.com\\\/en\\\/#\\\/schema\\\/person\\\/fd4343bfb6cfcc977b4a292d7d67520c\",\"name\":\"SuperAdmin\",\"sameAs\":[\"https:\\\/\\\/comsa.vunkers.dev\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Travipos is to supply 90,000 sleepers for the Extremadura high speed line","description":"The Ministry of Development, through Adif Alta Velocidad, has awarded Travipos the supply and transportation of 90,000 multipurpose sleepers for the","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/","og_locale":"en_US","og_type":"article","og_title":"Travipos is to supply 90,000 sleepers for the Extremadura high speed line","og_description":"The Ministry of Development, through Adif Alta Velocidad, has awarded Travipos the supply and transportation of 90,000 multipurpose sleepers for the","og_url":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/","og_site_name":"COMSA Corporaci\u00f3n de Infraestructuras, S.L.","article_published_time":"2014-07-01T09:49:27+00:00","article_modified_time":"2021-02-05T15:41:18+00:00","og_image":[{"url":"https:\/\/farm4.staticflickr.com\/3919\/14362823839_683f08b73e.jpg","type":"","width":"","height":""}],"author":"SuperAdmin","twitter_card":"summary_large_image","twitter_creator":"@comsa_corp","twitter_site":"@comsa_corp","twitter_misc":{"Written by":"SuperAdmin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/#article","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/"},"author":{"name":"SuperAdmin","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/fd4343bfb6cfcc977b4a292d7d67520c"},"headline":"Travipos is to supply 90,000 sleepers for the Extremadura high speed line","datePublished":"2014-07-01T09:49:27+00:00","dateModified":"2021-02-05T15:41:18+00:00","mainEntityOfPage":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/"},"wordCount":178,"publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/#primaryimage"},"thumbnailUrl":"https:\/\/farm4.staticflickr.com\/3919\/14362823839_683f08b73e.jpg","articleSection":["Infrastructures"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/","url":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/","name":"Travipos is to supply 90,000 sleepers for the Extremadura high speed line","isPartOf":{"@id":"https:\/\/www.comsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/#primaryimage"},"image":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/#primaryimage"},"thumbnailUrl":"https:\/\/farm4.staticflickr.com\/3919\/14362823839_683f08b73e.jpg","datePublished":"2014-07-01T09:49:27+00:00","dateModified":"2021-02-05T15:41:18+00:00","description":"The Ministry of Development, through Adif Alta Velocidad, has awarded Travipos the supply and transportation of 90,000 multipurpose sleepers for the","breadcrumb":{"@id":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/#primaryimage","url":"https:\/\/farm4.staticflickr.com\/3919\/14362823839_683f08b73e.jpg","contentUrl":"https:\/\/farm4.staticflickr.com\/3919\/14362823839_683f08b73e.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.comsa.com\/en\/infrastructures\/travipos-is-to-supply-90000-sleepers-for-the-extremadura-high-speed-line\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"COMSA Corporaci\u00f3n","item":"https:\/\/www.comsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"Travipos is to supply 90,000 sleepers for the Extremadura high speed line"}]},{"@type":"WebSite","@id":"https:\/\/www.comsa.com\/en\/#website","url":"https:\/\/www.comsa.com\/en\/","name":"COMSA Corporaci\u00f3n","description":"Construcci\u00f3n y mantenimiento de infraestructuras","publisher":{"@id":"https:\/\/www.comsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.comsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.comsa.com\/en\/#organization","name":"COMSA CORPORACI\u00d3N","url":"https:\/\/www.comsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","contentUrl":"https:\/\/www.comsa.com\/wp-content\/uploads\/comsa-logo.svg","width":1,"height":1,"caption":"COMSA CORPORACI\u00d3N"},"image":{"@id":"https:\/\/www.comsa.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/comsa_corp","https:\/\/www.linkedin.com\/company\/comsa-corporaci\u00f3n\/","https:\/\/www.youtube.com\/c\/COMSACorporacion"]},{"@type":"Person","@id":"https:\/\/www.comsa.com\/en\/#\/schema\/person\/fd4343bfb6cfcc977b4a292d7d67520c","name":"SuperAdmin","sameAs":["https:\/\/comsa.vunkers.dev"]}]}},"_links":{"self":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/11640","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/comments?post=11640"}],"version-history":[{"count":1,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/11640\/revisions"}],"predecessor-version":[{"id":12049,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/posts\/11640\/revisions\/12049"}],"wp:attachment":[{"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/media?parent=11640"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/categories?post=11640"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.comsa.com\/en\/wp-json\/wp\/v2\/tags?post=11640"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}